LLM4Rail studies whether LLMs can help improve feasible timetables and dispatching solutions, tighten lower bounds, and reproduce known optima. Of the 166 model entries in the catalogue, 87 have optima reported by a paper or benchmark library, and 2 have matching bounds across sources. The remaining 77 have no published proof of optimality.
All 18 PESPlib railway instances and all 21 TimPassLib railway and urban rail instances remain open.
Of the 112 DISPLIB instances, 72 are reported optimal in Tables 5–6 of Stärk et al. For two more, nor5_small_1 and nor5_small_5, the verified feasible objective values match the lower bounds reported in Table B.13 of Fuchs et al. The remaining 38 open instances are all 32 Wabtec instances, nor5_small_2, and nor5_large_1 through nor5_large_5.
MIPLIB 2017 marks all 15 tracked railway models as optimal in its official solution file, version 37.
LLM4Rail follows the research design of LLM4MIP, which applied LLM-assisted, solver-backed workflows to the open instances of MIPLIB. We ask the same question for railway problems, where the LLM can also draw on the structure of lines, periods, transfers and track layouts.
Two things we commit to from the start: no result is accepted from LLM output alone, and every reported result names the model, the solvers and the compute it used.